Works included the design and construction of 6 hectares of heavy-duty container storage hard standings comprising 470mm Cement Bound Granular Material (CBGM) pavement and brick paviours adjacent to the fully operation Berth 3.
Due to the sites remote location and limited material supply we utilised our in-house concrete batching plant to produce 30,000m3 of quality assured CBGM on site. All aggregates and cement were brought to site by sea. Utilising our own batching plant and technicians allowed us to maintain high levels of quality in the CBGM as this has been inherently problematic in other commercial ports.
As Civil Engineering Director, Paddy leads the delivery of projects across a wide range of sectors including Roads, Railways, Flood Alleviation, Marine, Utilities and Water. A graduate of the Queens University of Belfast, Paddy is a Chartered Civil Engineer, specialising in civil engineering infrastructure.
We are always keen to hear from you. Whether you have an enquiry, feedback, are interested in apprenticeships or joining the team, get in touch.