This project was required by DP World London Gateway for the temporary storage of MT Containers.

Works included the design and construction of 6 hectares of heavy-duty container storage hard standings comprising 470mm Cement Bound Granular Material (CBGM) pavement and brick paviours adjacent to the fully operation Berth 3.

Client

DP World London Gateway

Value

£10M

Duration

9 months

Due to the sites remote location and limited material supply we utilised our in-house concrete batching plant to produce 30,000m3 of quality assured CBGM on site. All aggregates and cement were brought to site by sea. Utilising our own batching plant and technicians allowed us to maintain high levels of quality in the CBGM as this has been inherently problematic in other commercial ports.

Key Contact
View Full Team
James Nicholl

James Nicholl

Pre Construction Manager
Read bio

James Nicholl

Pre Construction Manager

James leads all pre-construction activity including Business Development, Supply Chain Engagement, Preparation of PQQs, Tenders and Managing Multi-Disciplinary Teams.  A graduate of the Queens University of Belfast, James is a Chartered Civil Engineer and a Fellow of the Institution of Civil Engineers, specialising in infrastructure and marine engineering.

We are always keen to hear from you. Whether you have an enquiry, feedback, are interested in apprenticeships or joining the team, get in touch.

Connect with us